A list of to-do’s that constitutes what I do with my time away from the project:

  • clean and varnish exterior teak coamings and toe rails
  • buff port-side hull
  • replace deck plugs
  • install new engine switches (Cook Engine)
  • install fuel line shutoffs (Cook Engine)
  • finish tabbing in forward cabin support beams
  • caulk base of both hatches
  • build cover for engine gauges
  • replace plastic cockpit seat scuppers
  • paint cove stripe a deep gold
  • finish battery platforms in both cockpit lockers
  • install remaining cleats for running rigging
  • make cover for cockpit engine gauges
  • install cockpit locker latches
  • paint interior ceilings and bulkheads
  • finish fairing and painting cabin overheads
  • paint all bunkboards
  • make v-berth cushions
  • make stb saloon cushion